Past Projects

Wheatstone Project - Current

The Chevron-operated Wheatstone Project is one of Australia’s largest and most significant resources developments, set to play an important role in providing natural gas for the 21st century.

 

Construction began on the $37 billion Wheatstone Project, about 200kmnorth of Onslow in WA, in late 2011 and is now almost 60 per cent complete. The project is on track for completion in late 2016.

 

BUILDER:   John Holland

Perth Arena 2011

Work began on the Perth Arena roof in 2009 and was completed late 2011. Nationwide Roofing Pty Ltd installed the roofing on the retractable roof as well as much of the wall cladding. Some of the rooves required our boys to abseil down the building and install sheets at 60 degree angles on the North facing wall.. 

 

BUILDER:   BGC Construction

Matthews Netball Centre 2013
Matthews’ Netball Centre will remain the prime place for grass roots netball in the state for meny more decades to come. In 2011, work commenced on redevelopment of Matthews Netball Centre and the precinct it sits within – the Wembley Sports Park. The new building and courts are modern and well-suited to the needs of a leading and growing netball association. The building was finished and opened in 2013 and provides offices of PNA staff, a canteen for competition days, change rooms and storage space for clubs, and rooms for first aid and training courses.
 
Builder: PS Structures

 

Derby Prison 2011

46 various types of buildings incorporating a  gymnasium, medical facilitites, education and living quarters to house 120 male and 30 female inmates.  Nationwide Roofing installed all the roofing and wall cladding. The project began in 2010 and was completed in 2011.

 

 

BUILDER:  Cooper & Oxley

NIB Stadium 2013

In October 2013 the two stage $95.1 million Perth Rectangular Stadium redevelopment saw a new East Stand with undercover and corporate seating, new retail, beverage and merchandise outlets, 2 permanent big screens, LED signage along the east perimeter, seating in the North, 4 pitch flood lights and a new pitch.

 

BUILDER:  BGC Construction

Hedland Health Campus
Built on Colebatch Way next to the Karlarra House
residential aged-care facility, the new centre brings together the majority of health related services which were previously spread over sites in both South and Port Hedland to become a health care hub for the Pilbara region, providing Pilbara residents with access to more specialists in one convenient location.
 
The Hedland Health Campus is a brand new, modern, purpose-built facility, providing a range of inpatient and outpatient facilities and primary health services 
 

Completed 2010.

 

 

BUILDER:  Doric Construction

Dongara High School
 

Dongara District High School is a Level 5 K-12 school in the Mid West Region. The school operates on a single campus, 65 kilometres south of Geraldton and services the twin towns of Dongara and Port Denison as well as students bussed in on two services from the surrounding Irwin Shire.

 

Other Projects include:

  • Denmark Hospital
  • West Australian Institute of Medical Research
  • Cancer Center